• Project


    Nagpur Betul Project

    4- Laneing of Nagpur-Betul Section of NH-69 from Km. 137.000 to Km. 257.000 in the State of Madhya Pradesh and from Km 3.000 To Km 59.300 in the State of Maharashtra under NHDP Phase IV on Design, Build, Finance, Operate and Transfer (Annuity) basis.

    As per the provisions of the Concession Agreement the Concessionaire has successfully completed the construction of following items:

            i.             
    4-Laning of Project Highway (Total length)
    a)      Rigid Pavement
    b)      Flexible Pavement

    75.845 Kms.
    98.667 Kms.
    174.512 Kms.

          ii.             
    Service Roads (Flexible Pavement)

     20.385 Kms.

        iii.             
    Grade Separated Intersections

    6 Nos.

        iv.             
    Vehicular Underpasses (VUPs)

    11 Nos.

          v.             
    Pedestrian and Cattle Underpasses (PUPs)

    15 Nos.

        vi.             
    Construction of New Major Bridges
    a)      5 span of 30 meters
    b)      2 span of 29 meters
    c)      5 span of 19 meters
    d)      2 span of 29 meters
    e)      3 span of 19 meters
    f)       3 span of 27.9 meters
    g)      5 span of 20 meters
    h)      4 span of 20 meters
    i)        3 span of 20 meters
    j)        5 span of 20.6 meters

    150 Mtrs.
    58 Mtrs.
    95 Mtrs.
    58 Mtrs.
    57 Mtrs.
    83.7 Mtrs.
    100 Mtrs.
    80 Mtrs.
    60 Mtrs.
    103 Mtrs.
    10 Nos.


      vii.             
    Minor Bridges

    55 Nos.

    viii.             
    Railway Over Bridges (ROBs)

    6 Nos.

         ix.             
    Culverts etc.

    252 Nos.

           x.             
    Toll Plazas

    2 Nos.

         xi.             
    Supply, Laying and Commissioning of  Optical Fibre Cables (OFC)

    175.316 Kms.


    Date of commencement of Project:
    20.01.2012
    Contractual Date of Commissioning:
    17.07.2015
    Actual Date of Commissioning:
    18.02.2015
    Client:
    National Highways Authority of India